Ensign Standard 6-50PE

Ensign-installation - Sewage Treatment PlantMarsh Industries ENsign range of sewage treatment plants treat final effluent to British and European Standards to allow it to be discharged back into the watercourse whilst reaching national consent standards. Our tanks can be manufactured with either a gravity or pumped outlet to meet your site requirements.

At Marsh Industries we only use 100% virgin resin (no chalk fillers) in all our products. Lead times for Domestic Sewage Treatment Plants are normally only 5-7 working days.

 

How it Works:

(Click image to enlarge)

ENsign 6 Process - Sewage Treatment Plant

For dimensions of our tanks refer to the drawings page

Advantages of using Marsh Tanks:

  • No moving parts
  • Low running and maintenance costs (Approx. £52.00 per a 6PE)
  • Easy installation with ‘keying-in’ lip and lifting eyes
  • Tested and certified to BSEN12566-3
  • 50 year design life
  • 25 year structural guarantee
  • Shallow option available for areas in high water table or hard rock conditions (See our ENsign Shallow Range)

For more information please refer to our brochure